The AI-Native platform for Takeoff

Upload a drawing set. Vdrio finds the schedules and system rows, reconciles quantities, and finds conflicts so you don't have to.

VVdrio
Acme High School · Bid review
Schedule-backed takeoffA-601
CW-01Curtain wall1,248 SFHigh
SF-02Storefront410 SFReview
W-14Window wall216 SFHigh
DR-03Aluminum doors6 EAReview
SF-02shown on A-203, missing from schedule
SHEET 02
The bottleneck.
Why estimators are the choke point of every glazing contractor
Estimator bottleneck

Every bid starts with hours of manual checking.

Senior estimators still scan schedules, elevations, and markups by hand. Vdrio turns that search work into a reviewable queue so the bid can move sooner.

Manual takeoff per bid
200+ sheets per packet
Hours back before bid day
Manual takeoff queueBefore Vdrio
CW-01Count elevation panelsA-201
SF-02Find schedule matchA-601 schedule
GL-3Check glass type noteA-302
Hours back before bid dayReview, not re-tally
SHEET 03
How it works.
One packet · cited answers · review-ready quantities
Simple workflow

From drawing set to cited answers.

Drag in the packet, let Vdrio index the sheets, ask what matters, then open the cited source before carrying quantities forward.

Upload packet
Index sheets
Ask the set
Verify source
Carry quantities
Drawing packet214 sheets
01Upload packet
02Index sheets
03Ask the set
04Verify source
05Carry quantities
SHEET 04
Ask the set.
Cited answers from the drawing packet
Document chat

Ask a question. Open the cited sheet.

Upload the packet, ask where scope appears, and verify the answer against the exact drawing or schedule before anything goes into the bid.

Ask Vdrio
Grounded
Which sheets mention SF-02?
Vdrio is checking sources

Vdrio found SF-02 on A-203 and checked it against A-601.

A-203A-601Open source
SHEET 05
Trust over magic.
Four principles · Why this works on real bids
Trust model

Trust it because you can check it.

Every answer keeps the sheet, source, and review state attached. The estimator decides what enters the bid.

Source linked
Needs review
Estimator control
Source linkedNeeds review
A-203SF-02 storefront appears on west elevation.

A-601 schedule does not show a matching SF-02 row.

Estimator controlNothing changes without approval.
SHEET 06
Audit.
Ask the set. Get cited answers.
Audit rail

Audit the bid without leaving the drawing context.

Ask review, source, and scope questions against indexed project data. The answer stays grounded in the packet and points back to the sheets.

Which sheets mention SF-02?
What still needs review before this bid goes out?
Where is GL-3 referenced?
What is on A-601?
Audit Chatgrounded · cites sources
Which sheets mention SF-02?
SF-02 appears on A-203 · Storefront elevations and is checked against A-601 · Door + storefront schedule.
Review note A-203 shows the storefront at the west entry, but A-601 does not show a matching SF-02 schedule row.
▸ source_lookup: "SF-02"
← cited 2 sheets for estimator review
What still needs review before this bid goes out?
Two items need estimator review before this packet is bid:
SF-02 appears on A-203 but is missing from the storefront schedule context on A-601.
GL-3 is referenced in the glass schedule on A-302; verify the south elevation context before carrying the quantity forward.
Ask review, source, or scope…⌘K
SHEET 07 · ISSUE FOR BID

See your
next bid
done in

minutes.
Get started
Vdrio
Vdrio · 2026v0.1 · Pre-seed · Building